Operators: adrian gao tsentalovich
Hall open till 6:30 PM.
CCR had an access for a pump, Doug worked on the WC low voltage power supply.
Back in business, taken unpol H2 runs 5471, 5472 (still going). Crunching.
Event size now around 1600B. Called Karen, she confirmed it was now OK.
Plan (from Doug) is to switch to empty target after the current run is finished.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST