Re: [BLAST_SHIFTS] Shift summary 02/22/2004 C (8-12)

From: Chi Zhang (zhangchi@MIT.EDU)
Date: Sun Feb 22 2004 - 17:09:10 EST


I met the same multiple wish problem. killed all of them. seems some
problem with elog kept all the tcl programs backlogged.

On Sun, 22 Feb 2004, Electronic Log Book wrote:

> Operators: degrush adrian ----
>
> Relatively smooth data taking of ABS D2 50 sccm.
> runs 4981,4983. Coda died for 4982.
>
> WC L6, L21, R21 trip occasionally.
>
> L21 is set to 3800. all rest are set back to nominal voltages.
>
> dblast07 is running slow. "top" shows 8 "wish" 'es taking up a lot of cpu power. What is this for?
>
>
> Vitaliy says dilution factor is ~50%.
>
>
>
>
>



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST