There is a discrepancy between ABS flow rate readback and setpoint
The setpoint is 60 sccm the readback is 23 - see elog.
PK
----------------------------------------------
Pete Karpius
Graduate Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1220
FAX: (603)862-2998
email: karpiusp@einstein.unh.edu
http://pubpages.unh.edu/~pkarpius/homepage.htm
----------------------------------------------
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST