Operators: zhangchi seely ----
at the beginning of the shift, HV crates had to be power recycled.
taking data. L21 tripped frequently at about 1am, had to lower HV on both sense and guard wire. later on, L6 tripped frequently and had to lower HV on sense.
after a period of time, both seem to recover and HV were restored to their normal value.
crunching is lagging behind. Chris is in the counting bay all night preparing for the "analysis meeting". Jason and Ben are doing so too. by their request, quite a few CPUs are spared from crunching.
CCR informed that hall will be open at 8:00. seems like we will have some time to catch up with the crunching.
lost absinfo display somehow. used 'startleftdisplay' to reestablish all monitors on dblast14. don't be suprised to see some empty space in 24hr beam monitor.
since plenty of ep people arround, shifter did not do ep analysis.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST