[BLAST_SHIFTS] Shift summary 12/16/2003 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Dec 16 2003 - 07:50:16 EST


Operators: nikolas chris2 nikolas

Data taking.
Had 2 hour transmitter problem. Peter Binns came in, decisions will be made about what to do once people come in.
WC L6 tripped repeatedly.
ABS Nozzle seems to be freezing. Ligit went down to 5.6e-8 (see elog entry with the ligit plot). Convectron gauge up. Temporarily disabled ABS alarms, need to re enable to run (dblast12). Decision on what to do will be made shortly.