Operators: seely nikolas nikolas
Continued data taking with single state pol H2. Took runs 3975,3976,3977,3979,3981.
For run 3975, CCR had to go down to the Hall to fix a stuck slit. Even though their attempt was unsuccessful, we continued filling and data taking without moving that slit (left). BQM rates not affected.
The CCR is preparing to open the hall at 7:30.