Several CODA hangs due to roc-r CPU crash/reboots.

HV crate gave several broken pipes - one of them required a hard reset, the others were solved with BOOT.

WCs R17 and R18 are still OFF. The HV crate L2 and R2 triped frequently, and it became worse near the end of the shift.

Overall, not a smooth shift. We could get only 3 runs that finished without CODA problems. The rest were 150-170k-event runs.