Operators: seely clasie ----
mostly smooth data taking. ran at 40 mA injection.
few wire chamber trips, but nothing major. CCR rebooted dtun IOC (see elog)
took runs 3671-3675 (level 2 trigger); and 3676-3682 (level 1 trigger)
all level 2 runs are crunched, and some analysis has been done (see elog entry for details and asym plot). rest of runs are crunching.
VZ noticed that the elas_events/C in charge files is a factor of three smaller for level 2 trigger runs. don't know what's up with that yet.
js
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST