[BLAST_SHIFTS] Shift summary 10/05/2003 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Oct 05 2003 - 10:05:20 EDT


Operators: degrush ---- ----

Continued taking empty target, holding field on data.

Between 4:40 and 4:50 problem with holding field current resurfaced. Again Set
Current was 500 A,, readback was ~300A and front of power supply read 504A. Townsend was called and believed a temp sensitive short in the power supply is a likely candidate for the instability.

Since there was no immediate fix except prayers and lowering the set current, I decided to continue on and asked CCr to set turn the holding field off, set the blast power supply to 30% reverse. Flowing of 0.1 sccm unpol h2 and asked to retune the beam and get the best tune possible as per Tancredi's instructions.

Empty Target Runs with holding field:

3098, 3099,

3100-3101 (with the problems occuring with the holding field occuring either at the very end of 3100, or begining of 3101).

 



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST