[BLAST_SHIFTS] Shift summary 10/02/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Oct 02 2003 - 11:39:05 EDT


Operators: nikolas degrush tester

Continued taking empty target data with beam bump:

No judgments can be made about dependence of reconstruction rates on beam position due to bumps from online monitor. Crunched data needs to be analyzed.

-1mm horizontal bump:
Rates(80mA/8min)
Phys0=2000 Bphys150

Runs: 2995-3000
Note: Saw significant charging in WC due to high rates.

+1 Vertical
Rates(60mA/15,5 min)
Phys0 800 BPhys0 200
Phys1 327 Bphys0 70
Phys2 700 Bphys2 130
BQM's U=126,D=69, L=52,R=41
slits=-T=.5, B=-7, T=0.6, L=-5, 5.5,R

Runs 3006,3007,3008,3009...



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST