Re: [BLAST_SHIFTS] Shift summary 10/01/2003 D (12-16)

From: Nikolas C Meitanis (nikolas@MIT.EDU)
Date: Wed Oct 01 2003 - 17:29:50 EDT


Plot is now in the elog, entry around 17:00 10/01/2003

n

On Wed, 1 Oct 2003, John Calarco wrote:

>
> Which previous email?
>
>
> On Wed, 1 Oct 2003, Electronic Log Book wrote:
>
> > Operators: seely nikolas ----
> >
> > Both empty target runs and 0.1sccm unpol H2 runs with the collimator in place were taken. Preliminary analysis of the empty target runs indicates that the background has improved compared to before the collimator was used. See previous email for a plot. Target runs are still crunching.
> > During the shift both the spuds 4 and the scratch on dblast07 were full. The situation was taken care of by Tancredi et. al.
> >
>
> --
> John R. Calarco
> Dept. of Physics
> Univ. of New Hampshire
> Durham, NH 03824
> phone: (603)862-2088
> FAX: (603)862-2998
> email: calarco@unh.edu
>
>



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST