Operators: kohlm degrush ----
Beam came back by about 4am after the problems with transmitter 11 have been solved.
Beam tuning with BQM/slits done. Low BQM rates achieved (empty target).
However, physics event rate is already quite high (>500Hz at 70mA)
See extra elog entries for details.
Plan is to measure z distribution with empty target and then switch to H2 unpol during the morning hours.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST