Thanks for looking into this Chris!
Pete
On Tue, 23 Sep 2003, Chris Crawford wrote:
> hi pete,
> i think the problem with the crunching is runs with B=0. you get
> degenerate matrices in p. present solution: don't crunch runs with B=0!
> --chris
>
> Electronic Log Book wrote:
>
> >Operators: baris karpiusp hauke
> >
> >CCR tuned beam until about 2200. At one point during tuning we had a "broken pipe" and had power cycle the crates to get the BQMs back. Started taking data with run 2801 but immediately had to adjust WC voltages. At shift change adjustments were:
> >L1=3600V, L21=3650, L14=3600, R14=3700, R24=3700
> >***ALSO*** Whenever we go to STBY Crate #1 trips. I checked all detector modules to find the culprit but could not. As soon as OPER state returns the trip is rectified. Still a mystery at end of shift? (Could this have something to do with overwriting any LADS HV info when I re-ran the BOOT script?)
> > --->>>>Crunching = not fast (50 runs behind??)<<<<---
> >
> > Pete
> >
> >
> >
> >
>
>
----------------------------------------------
Pete Karpius
Graduate Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1220
FAX: (603)862-2998
email: karpiusp@einstein.unh.edu
http://pubpages.unh.edu/~pkarpius/homepage.htm
----------------------------------------------
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST