[BLAST_SHIFTS] Shift summary 09/13/2003 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Sep 14 2003 - 00:46:39 EDT


Operators: shino yxiao milner

In general, pretty smooth empty target data taking till 23:30; WC L6 and R0
tripped twice or thrice. Run 2442-44 are valid and were cruched.

Then switched to unpol. D data taking -- expt. settings: Blast=ON, no holding
field, T_cell=100 K, gas flow=0.1sccm, Ligit=3.3 e-7 torr.

CCR got some problem to reduce the beam halo. The current BQM readouts:
T=136, L=64, B=36, R=39.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST