Operators: karpiusp chris2 ----
Beam tuning through beginning of shift.
CCR made a -2mm hz bump achieving a lifetime of 37 min @ 90 mA
BQM U was 350 w/ slits out
I asked that the BQMs be checked and optimized with slits in.
BQM U was lowered to about 211. Took empty target run 2134 and plotted zwl and zwr, see (elog) below image.
Bill Franklin called and asked if he could start compton work, I told him that was fine.
CCR continued to tune during crunching of run 2134
PK
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST