[BLAST_SHIFTS] Shift summary 08/19/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Aug 19 2003 - 04:11:23 EDT


Operators: chris2 karpiusp ----

up until midnight, doug tried varied the beam bumpers around the target and the septum position to minimize the events coming from a empty target

after that, we have been taking polarized data. runs 2109-2117. things ran smoothly.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST