Operators: zhangchi zwart ----
Unpol Running continued. Ligit 1.6e-7, 0.05 sccm
Runs 1960 - 1971 are normal Unpol
4:17am, CCR called, lost beam due to unknown reason. stopped run 1967, got beam back in 5 minutes
Run 1972 is junk
Run 1973
After Injection we moved the injection septum away from the stored beam by ~5mm (11.65 upstream, 10.68 downstream --> 17mm upstream and 17 mm downstream) The halo rates were reduced by more than a factor of 2. This run continued to 30 mA to aquire some statistics.
Operations begins to open the Hall at 6:30 AM for ABS Nozzle work.