[BLAST_SHIFTS] Shift summary 07/26/2003 Swing

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Jul 27 2003 - 00:36:24 EDT


Operators: chris2 clasie ----

We tool unpolarized deuterium runs at 0.05 sccm flow rate. Runs 1753-1754, 1756-1763 and 1765.

Cerenkov R1-2 tripped contiunously throughout the shift, and we increased the temp alarm set point of T1 on the wire chambers from 40 to 42 degC. We also needed to reboot the Compton several times at the beginning of the shift.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST