Operators: tavi ---- ----
7/26/03 00:16 M.F. and Tavi on shift, taking unpol runs with 0.05 sccm flow, Tavi preparing for CC gain matching. Finished just half of CC's big boxes. Tavi will finish the remaining tubes in the next shift.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST