Operators: tsentalovich karpiusp ----
BQM rates at start of shift:
U = 138, D = 49, R = 53, L = 103,
Imax = 110, tau = ~17
PHYS0 = 100Hz/95mA
WC signal:noise ~ 4:1 for worst case
went to 2:1 by end of shift
L6 tripped periodically throughout shift but not so frequent as to require
a change in voltage.
Had to soft boot SFI's only once.
Rebooted HV gui 2 times
Took runs 1526-1537 with a few junk runs in between.
Crunched several of these and updated the RUNLIST.
CCR called at end of shift - problems with master oscillator.
no beam for ~30min
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST