[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Jul 18 2003 - 08:02:11 EDT


Operators: tsentalovich karpiusp ----

BQM rates at start of shift:
U = 138, D = 49, R = 53, L = 103,
Imax = 110, tau = ~17
PHYS0 = 100Hz/95mA
WC signal:noise ~ 4:1 for worst case
went to 2:1 by end of shift

L6 tripped periodically throughout shift but not so frequent as to require
a change in voltage.

Had to soft boot SFI's only once.

Rebooted HV gui 2 times

Took runs 1526-1537 with a few junk runs in between.
Crunched several of these and updated the RUNLIST.

CCR called at end of shift - problems with master oscillator.
no beam for ~30min



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST