[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Jul 12 2003 - 16:20:59 EDT


Operators: alarcon tong ----

No beam yet.
Still having communication problem between IOC and Siberrian snake.
The chief operator is trying to replace the epics control card in the
computer, attached to Siberrian snake.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST