Re: [BLAST_SHIFTS] c shift saturday 14 june

From: Adam Jon DeGrush (degrush@MIT.EDU)
Date: Sun Jun 15 2003 - 00:54:15 EDT


I am glad you were able to enjoy my copy of "Godot" during your shift.
Maybe "The Myth of Sisyphus" would be more appropriate.

On Sat, 14 Jun 2003, Nikolas C Meitanis wrote:

> Took several runs at 0.05sccm H2 unpol for false asymmetry data.
> Slowed down by WC boxes tripping. Waited 30 min with voltages on standby
> for L1 box of WC to calm down. It didnt have a significant effect. Lowered
> voltage on L1 to 3700 from 3800 as directed. Tripping reduced
> significantly.
> Lated in the night we had to stop again for 30 min since other boxes
> seemed to be charging up. Moved L1 back to 3800. In the process, unrelated
> to all above, we had problems rebooting the epics crate. Rebooted the HV
> crates in the Dtunnel. Called Adam and he fixed the problem. Started
> running again.
> In all took runs 912, 913, 914, 916, 918, 919. Started 921.
>
> On a personal note, i found a copy of "waiting for godot" in the counting
> bay; it makes for a good read during data taking.
>
> vz, nm
>
>
>



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST