CCR worked on tuning the beam for higher current. HV crates were rebooted 
physically at Dtunnel. Unpolarized Hydrogen flow was set to 0.1 sccm. 
Wire chamber HV has been tripping quite often. Started to take data. Run 
number 805 with lamda/2 out. 
Baris 
W.Xu (in absentia)
 
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST