Hello everybody:
this is a plea for help in the D-tunnel in preparation of the short
deadline for wch/abs tests with beam. This time everything has to be
perfect as there won't be much time to look back for problems and we
have a long long run ahead of us.
We need all available help. We have one week to maintain/fix the old
system and that is next week. The week after that we need time for a
number of upgrades (new hv, spin bits, lumi/moeller)