[BLASTTALK] Organisation meeting 27/1/03

From: Douglas Hasell (hasell@MIT.EDU)
Date: Mon Jan 27 2003 - 11:53:14 EST


BLAST Organisation for 27 January, 2003

Physical layout of LADS still needs to be reviewed (JK and DH). Currently
do not have enough PMT's to equip all bars (96 working, need 112). Bases
will probably not be available until the end of February.

ABS work continuing on replacing heaters and sensors. Investigating
improvements to vacuum system.

Work should proceed on replacing or repairing TOF and Cerenkov channels.

JK is ordering magnet iron sheets to perform a new test of magnet shielding
of Cerenkov tubes. Because of ABS work and also iron not readily available
probably will not take place this week.

Beam quality monitor should be discussed next week after Tancredi has had a
chance to review the data from the TOF's from the last runs.

Coordination of BLAST toroid powering during the shutdown should go through
Jim Kelsey. Issues of safety, water cooling, power supply, restricting
access to pit, etc.

                                                  Cheers,
                                                          Douglas

26-415 M.I.T. Tel: +1 617 258 7199
77 Massachusetts Avenue Fax: +1 617 258 5440
Cambridge, MA 02139, USA E-mail: hasell@mit.edu



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST