Physics shifts starting at midnight tonight (Sunday 0000-0800)
are cancelled for at least 32 hours (0800 Monday) or until
further notification. The accelerator group is planning to
do some beam tests (higher current and/or lower energy) until
at least Monday.
-- John R. Calarco Dept. of Physics Univ. of New Hampshire Durham, NH 03824 phone: (603)862-2088 FAX: (603)862-2998 email: calarco@unh.edu
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST