CCR worked on optimizing the beam all morning. eventually (~ 5 am) got
a stable 75 mA, but since the south hall is due to open at 7am (meaning
CCR will take the beam at 6:30), it was too late to get anything useful
done, so no runs were taken.
js
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST