Re: [BLAST_SHIFTS] 12/07/2002 day shift

From: Chris Crawford (chris2@lns.mit.edu)
Date: Sat Dec 07 2002 - 18:11:36 EST


hi adrian,
  was the error message actually a warning about two bit patterns being
the same in the XMLU? this is not an error, but just an indication that
there may be a problem in your trig file. ( elastic_coincs has that
warning, but is o.k.)
--chris

Adrian T Sindile wrote:
>
> The goal was to check the 4 ADC channels with really high pedestals,
> adjust a few TOF HVs and implement MySQL security.
> Only the last thing on my list got done, as we were not allowed access to
> the D-tunnel at any time. There was a problem with the door between the
> D-tunnel and the South Hall, so it was deemed unsafe to be in the D-tunnel
> while beam was being tuned.
>
> I discovered one potential problem when Bill had a short access for the
> laser: downloading any trigger file gave me an error message about the
> X-MLU. I reported this to Tancredi - he suggested to go reset the CAMAC
> crates, but as I already said, it had been decided that the Compton people
> run till 4 PM, at least. Tancredi said he would be at Bates by 4 PM...
>
> Adrian
>
> -------------------------------
> Adrian Sindile
> Research Assistant
> Nuclear Physics Group
> University of New Hampshire
> phone: (603)862-1691
> FAX: (603)862-2998
> email: asindile@alberti.unh.edu
> http://einstein.unh.edu/~adrian/



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST