The hall was open for most of the day during which time work progressed on
the tdc offset code. Min and max position bins were defined
as 90% of the avg bin content. Position plots are now generated
within these boundaries. (more comments will be sent to the ANAWARE list
eventually)
At 1500 the beam became available.
Slit optimization began without gas using elastic_coincs.settings. With
slits in final position a normalized rate of ~.84 Hz/mA was observed.
Gas was then set to flow at 0.2 SCCM and the optimization continued.
With further adjustment a normalized rate of 1 Hz/mA was attained.
RUN 2835 elastic_coincs.settings was started just before shift change.
Pete
----------------------------------------------
Pete Karpius
Graduate Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1220
FAX: (603)862-2998
email: karpiusp@einstein.unh.edu
http://pubpages.unh.edu/~pkarpius/homepage.htm
----------------------------------------------
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST