[BLAST_SHIFTS] Shift report, C 11/12/02

From: Vitaliy Ziskin (vziskin@lns.mit.edu)
Date: Tue Nov 12 2002 - 23:51:18 EST


On shift Prof. Smith, Vitaliy Ziskin

1) Adjusted trigger delay for neutron and trigger to improve the tdc spectra for
right side tube of all neutron counters.

2) Got beam at 10:00. Optimized slits' positions and local bump at the injector
septum. Values are in the log book.

3) Noticed that the RCer0 was not reading anything. Went to the Dtunnel and found a
bad cable. Recrimped it with the make shift connector, but it needs to
be fixed tommorow by proffesionals.

4) Took data with the beam helicity flipped.

5) fixed TBLRaw such that we can read sector 0 & 1 neutron

                                                VZ, TPS