Please note that the hall is expected to be open during the day
shifts both Thursday and Friday. This is due to installation of
ABS components, but it will allow us to check the n-bars for
light leaks and time them in to the trigger with the flasher.
This means that the flasher connections need to be made during
the day shift tomorrow (Thursday) and checked.
-- John R. Calarco Dept. of Physics Univ. of New Hampshire Durham, NH 03824 phone: (603)862-2088 FAX: (603)862-2998 email: calarco@unh.edu
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST