Hi, John!
Tuesday and Wednesday during the day (8 AM to 4 PM if nobody else needs
the DAQ for other things) I want to make sure all the TOFs will be
gain-matched to perfection. I need cosmics so that works out fine, I
can do it in parallel with target installation.
I would also like to take Thursday and Sunday day shifts (8 AM to 4 PM)
also - for TOF efficiency tests and/or checking the timing with the new,
adjusted voltages.
Thanks!
Adrian
-------------------------------
Adrian Sindile
Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1691
FAX: (603)862-2998
email: asindile@alberti.unh.edu
http://einstein.unh.edu/~adrian/
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST