Re: [BLAST_TOF] Wednesday, end of day shift

From: Adrian T Sindile (asindile@cisunix.unh.edu)
Date: Wed Sep 11 2002 - 21:37:38 EDT


Hi, John!
I know you replied to all the TOF group - I only want to say that I did
not have time to check with the scope at the end of the shift and Pete
has been doing this since he started after me... I always do it when I
know what I am after and I believe I can find the solution by looking at
the scope.
Since the only thing that got changed was that cable, I assumed that did
it - just pointing out to a possible solution here.

As I said earlier, I took a few runs which showed efficiency over 99% for
LTOF#1 - the runs are still there and can be looked at by someone else who
could doublecheck me (I am positive about that).
I find it hard to believe it was a coincidence (with timing problems),
result of a mistake etc. - to get 99% for those runs.

Adrian

-------------------------------
Adrian Sindile
Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1691
FAX: (603)862-2998
email: asindile@alberti.unh.edu
http://einstein.unh.edu/~adrian/



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST