shift summary 7/15 16:00-24:00

From: Chris Crawford (chris2@lns.mit.edu)
Date: Tue Jul 16 2002 - 00:28:38 EDT


we put the detectors back together, closed the hall, and took some data
with "JCplan_right_9.settings" (runs 607-612)
the flasher was not installed on the start counter.

we suspect a light leak in the LTOF11 scintillator; the adc's are real
high, but the tdc's don't fire very often (because the signal is always
above threshold?)

adrian, yuan, chris



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST