start counter f.o. caveat

From: Peter Karpius (karpiusp@einstein.unh.edu)
Date: Sun Jul 14 2002 - 06:48:53 EDT


This is in the logbook but it is worth reiterating. Since the start
counter has been moved to the right side of Blast, there is less slack in
its borrowed fiber optic cable. Plese verify that this cable is
disconnected prior to separating the subframes if it looks as if it won't
reach.

                                Pete



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST